Downtown/Flats Design Review Case Report
CLEVELAND ROWING FOUNDATION TEMPORARY BUILDING
Return to Case List | Start Over
| Print Report (PDF format)
Project Information
Downtown/Flats Case # DF 2014-100
| Address: | 1003 British Street |
| Company: | Cleveland Rowing Foundation |
| Architect: | Naeem Akhter |
| Description: | The proposed building is a temporary, pre-engineered fabric structure building intended to house rowing shells (boats). The building will be placed on a concrete slab that runs parallel to the bulkhead of the Cuyahoga River. The 5,880 sq. ft. building (56 ft. X 105 ft.) is a gable style truss arch fabric structure designed entirely for the storage of rowing shells and equipment. Helical anchors will be used to secure the building to the foundation. |
| Notes: | |
Committee Actions/Submissions
| Date: | October 6, 2014 |
| Committee: | Staff |
| Action Type: | Initial Plan Submission |
| Conditions/Notes: | |
| Date: | October 16, 2014 |
| Committee: | Local Design Review Committee |
| Action Type: | Approved with Conditions |
| Conditions: | |
Master Plan to be submitted to DRAC and dimensioned site plan to be submitted to staff. |
|
| Date: | October 17, 2014 |
| Committee: | City Planning Commission |
| Action Type: | Approved |
| Conditions: | |