Northeast Design Review Case Report
MARATHON GAS STATION & CONVENIENCE STORE EXTERIOR MODIFICATION
Return to Case List | Start Over
| Print Report (PDF format)
Project Information
Northeast Case # NE 2019-046
| Address: |
14012 St. Clair Ave |
| Company: |
Tribe Architects |
| Architect: |
Tribe Architect |
| Description: |
Proposed exterior modification, landscaping, brand refresh, fencing, site work, and dumpster enclosure. |
| Notes: |
|
| |
Committee Actions/Submissions
| Date: |
November 26, 2019 |
| Committee: |
Staff |
| Action Type: |
Initial Plan Submission |
| Conditions/Notes: |
|
Voting Members Present
- A. Lukaczy-Love (2nd)
- P. Brown (CH)
- N. Reich (1st)
Project details presented by Daryl Mapson of Tribe Architects. Presented details on the addition, removal of the interior car wash features, adding a new wood roof, a new aluminum storefront, painting the existing block, color and material samples, LED lighting
Committee Questions, Comments, Concerns
- Are there public restrooms?
- Are you staying within the existing footprint?
- Do you have any photometric drawings to show light cast? Can you use a rope light and ran it under the shadow line to cast the lighting on the storefront
- Adding to the existing landscaping beds. Return with full landscaping plan.
- Can all the concrete be pulled up surrounding the car wash area.
- Move the dumpster enclosure to closer to the building.
- Crash rated bollards because the existing bollards are dinged up.
- Will the existing walk be rebuilt? Yes
- Are you tearing out the existing bollards are installing new ones? Yes
- Can you increase the walkway to at least 5'? Yes, will have to move the parking spaces south
|
|
| Date: |
December 3, 2019 |
| Committee: |
Local Design Review Committee |
| Action Type: |
Approved with Conditions |
| Conditions: |
|
Motion to approve with the following conditions
- submit a photometric plan and updating lighting plan using rope lighting
- full landscaping plan showing the additions to the planting beds, study using evergreens for opacity
- relocating the dumpster enclosure to closer to the building
- removing the asphalt surrounding the old car wash and adding grasses/landscaping
- increasing width of side walk and extending it to St. Clair
- install new crash rated bollards
|